Details
- Contract Period 23 Jul 2015
- Location Mumias, Kenya
- Contract completion 2007 - 2009
- Value USD 10 million
- Client Kenya National Highways Authority
- Physical completion 100% completed
- Category Roads
Description
The contract comprised of construction to bitumen standard total of 30km road with 18km double surface dressing and 12km in asphaltic concrete. The road sub base and base are in natural gravel material stabilized with lime & cement. The works include drainage structures. Pipe culverts box culverts and widening of 45m long bridge across Yala River.